| July 2010: UK’s largest waste-to-energy plant will be equipped with Clyde Bergemann’s on-load boiler cleaning systems |
|
Von Roll Inova, the Swiss subsidiary of the internationally active A-TEC INDUSTRIES AG conglomerate has awarded Clyde Bergemann with the turnkey delivery of three SCS Shower Cleaning Systems to be installed in the 72 MW Riverside f
 |
 |
|
| July 2010: First UK SCR project will include Clyde Bergemann’s on-load cleaning technology |
|
Doosan Power Systems, UK, (formerly Doosan Babcock Energy) experts in steam generation technology for the global power market, awarded Clyde Bergemann Ltd, Scotland (CBS) the contract to deliver on-load cleaning systems (sootblower
 |
 |
|
| May 2010: Clyde Bergemann DRYCON GmbH win contract to replace lean phase ash slurry system with dense phase technology on lignite-fired power plant in Serbia |
|
Serbian power company JP Elektroprivreda Srbije (EPS) awarded the turnkey contract to upgrade their ash collection system and replace the existing hydraulic ash handling systems at the TEKo A lignite-fired power plant in Kostolac,
 |
 |
|
| May 2010: CBEEC completes environmental retrofit project for NRG Energy |
|
Hanover, Maryland (May 14, 2010) - Clyde Bergemann EEC (CBEEC) has completed a three-year environmental improvement project for NRG Energy, Inc. that reduces air emissions beyond requirements with lower operating costs, and minimiz
 |
 |
|
CASE STUDY: DRYCON See how our Dry Bottom Ash Handling solution provides 99.9% availability |
|
brochure
 |
|
NEW: CASE STUDY FABRIC FILTER: Reduced emissions and fan power consumption on a UK energy from waste plant |
|
brochure
 |
|
NEW: BROCHURE DRYCON: Dry ash conveying solutions for lower emissions, lower costs and increased efficiency |
|
brochure
 |
|